Online Detailed Design
What is it?
This is the second stage of BSCS Project Development.
At this stage, all working documents are developed. The documents should have the degree of developmental work sufficient for system installation.
Detailed documentation is developed on the basis of project documents. All methodological basis and system structure, specified in Monitoring Methodology at Pilot Project stage should remain unchanged.
Similar to Online Pilot Project Service, BSCS Developer Service website provides the User with a set of services to accompany BSCS Working documents development.
In case of a single purchase of this package, the User is granted an opportunity to use its sub-services for unlimited time and an unlimited number of projects (sites). The package Online Detailed Design includes the following unlimited services:
- Monitoring Passport Development Service
- Electrical Schematic Diagram Development Service
- Schematic Diagram Development Service
- Technical Specification Development Service
Thus, the User can use these services for an unlimited number of objects (sites).
Also at the stage of Detaied Design the boundary values of monitored parameters of bearing structures (system response criteria) should be determined. This is a complicated scientific task. To solve it, the User must have qualification and experience in design, and to have expensive software at his disposal.
The document containing the list of boundary values for all monitored parameters is called Monitoring passport. To get this document, one can use Monitoring Passport Development Service.
Provided that the list of monitored parameters and design solutions for each site is unique, this service is not included in the standard package of «Online Design Project» services and must be paid separately.
The cost of the service is generated individually for each site, depending on its complexity.
How does it work?
To use the service, the User must have completed Pilot Project stage by using the appropriate BSCS services.
The work should be started with the Service on developing Monitoring Passport. While passport is being developed, one should start developing Schematic Diagram and Electrical Schematic Diagram, and Specification.
After receiving the results of all the services, the User himself should make the documents in accordance with relevant regulations of his country, and makes a complete set of missing drawings, if any.